I am going to clean the frame and swingarm and replace the swingarm and rear shock bearings and seals.
I will also clean the rear sub-frame, brakes, footpegs/brackets etc,etc.
I may get race stand lugs welded to the swingarm too.
On re-assembly I will:
fit the SP suspension front and rear.
fit the SP rear wheel.
Wiring loom will need to be fitted as well.
Rolling chassis |
Stripped down |
Swingarm spacer and Locknut |
Home made 16mm Allen key and 4-way castellated tool (26mm ID) for threaded swingarm spacer and locknut |
No comments:
Post a Comment