Sunday, October 30, 2011

Rolling Chassis Stripdown

Yesterday I stripped down the rolling chassis.
I am going to clean the frame and swingarm and replace the swingarm and rear shock bearings and seals.
I will also clean the rear sub-frame, brakes, footpegs/brackets etc,etc.
I may get race stand lugs welded to the swingarm too.
On re-assembly I will:
 fit the SP suspension front and rear.
 fit the SP rear wheel.
Wiring loom will need to be fitted as well.
Rolling chassis

Stripped down

Swingarm spacer and Locknut
Home made 16mm Allen key and 4-way castellated tool (26mm ID) for threaded swingarm spacer and locknut

No comments:

Post a Comment