Saturday, June 13, 2009

Beginnings of re-assembly

Dave pulled the front wheel off and swapped the handlebars back to being underneath the top triple clamp.
Cleaned the rims and frame.
Welded up the LHS Muffler mount bracket.
Welded up the instrument support bracket.

Tuck assembled the rear subframe under carriage plastic shroud, and mounted the instruments.
Also Dave had some "SuperBike" brand handlebar grips kickin round spare in his shed so Tuck put them on.

Other things that we found we need:
Swingarm chain guide/protector plastic.
Need to weld/straighten the LHS footpeg bracket as it is bent.
The LHS front top fairing frame lug needs to be rewelded and drilled and tapped.
Replace front brake fluid reservoir bracket and associated dodgey bolt.

No comments:

Post a Comment